Brindle AF and Anderson BH, 1986. “A Space Station Onboard Scheduling Assistant” Boeing Aerospace Company, Technical Report.

Britt DL, Geoffroy AL and Gohring JR, 1988. “Contingency rescheduling of spacecraft operations” Telematics and Informatics5 (3).

Brown MC, 1988. “The dynamic rescheduler: conquering the changing production environment” In: IEEE AI Applications ConferenceIEEE Computer Society,Washington, DC.

Collins C, George J and Zamani E, 1989. “Strategies for Automatic Planning: A Collection of Ideas” NASA Jet Propulsion Laboratory, JPL Publication89–12, Pasadena, CA, 05 1.

Computer Sciences Corporation, 1990. Network Control Center User Planning System System Requirements DocumentNASA Goddard, Greenbelt, MD, 02.

Computer Sciences Corporation, 1988. User Planning System Operational Concept DocumentNASA Goddard Space Flight Center, Greenbelt, MD, 09.

CTA Incorporated, 1990. Lessons Learned from the Network Control Center (Draft)NASA Goddard, Greenbelt, MD.

Das BK, Berg RA and Janssen T, 1988. “NOA: A Network Operator Assistant for Scheduling TDRSS” In: NASA Marshall Second Conference on Artificial Intelligence for Space ApplicationsHuntsville, AL.

Decision Support Software, Inc., 1985. Expert Choice Manual 1430 Vincent Place, McLean, Virginia.

Durham R, Reilly NB and Springer JB, 1990. “Resource Allocation Planning Helper (RALPH): lessons learned” In: NASA Goddard, Conference on Space Applications of Artificial Intelligence ProceedingsGreenbelt, MD.

Eggemeyer WC and Cruz JW, 1990. “Plan-It-2; the next generation planning and scheduling tool” In: NASA Goddard, Conference on Space Applications of Artificial Intelligence ProceedingsGreenbelt, MD.

Floyd S and Ford D, 1986. “An expert system for dynamic scheduling” In: 21st Intersociety Energy Conversion Engineering Conference ProceedingsAmerican Chemical Society.

Fox MS, Allen B and Strohm G, 1982. “Job shop scheduling: an investigation in constraint-directed reasoning”: National Conference on AI ProceedingsAmerican Association for Artificial Intelligence,Menlo Park, CA.

Geoffroy AL, Britt DL and Gohring JR, 1990. “The Role of Artificial Intelligence Techniques in Scheduling Systems” In: Proceedings Goddard Conference on Space Applications of Artificial IntelligenceNASA,Goddard.

Goodman N, 1989. “Scheduling Results Analysis Report for the NCC Prototype Testing” Task 20–103, NASA Goddard, Greenbelt, MD, 11.

Hankins GB, Jordan JW, Katz JL, Mulvehill AM, Dumoulin JN and Ragusa J, 1985. “Expert mission planning and replanning scheduling system” In: Expert Systems in Government Conference ProceedingsIEEE Computer Society,Washington, DC.

Hedberg S, 1989. “AI in scheduling” Spang Robinson Report on Artificial Intelligence5 (3) 03.

Jaap JP and Davis EK, 1988. “The scheduling techniques of ESP2” In: NASA Johnson, SOAR Conference ProceedingsHouston, TX.

Liebowitz J and Lightfoot P, 1987. “Expert scheduling systems: survey and preliminary design concepts” Applied Artificial Intelligence Journal1 (3).

Liebowitz J, 1989. “Problem selection methodologies for expert systems development” In: Liebowitz J and DeSalvo DA (eds.), Structuring Expert Systems: Domain, Design, and Development, Prentice Hall.

Matlin S, 1988. “Automatic scheduling and planning (ASAP) in future ground control systems” In: Artificial Intelligence for Space Applications Conference ProceedingsNASA,Marshall.

McLean DR and Dent CP, 1989. “Reactive planning techniques for satellite mission planning” In: Expersys-89 ProceedingsIITT-International, Paris.

McLean DR, Page BJ and Potter WJ, 1990. “The Explorer platform planning system: an application of a resource reasoning planning shell” In: Proceedings Ground-Based Spacecraft Control ConferenceDarmstadt, Germany.

McLean DR, 1990. The Explorer Platform Planning System Phase 1 Critical Design Review DocumentBendix Field Engineering, Inc., Seabrook, MD, 06 18.

Miller G, Johnston M, Vick S, Sponsler J and Lindenmayer K, 1988. “Knowledge based tools for Hubble Space Telescope planning and scheduling: constraints and strategies” Telematics and Informatics5 (3).

Mitchell P, 1989. “An expert system for shuttle and satellite radar tracker scheduling” In: NASA Johnson, SOAR Conference Proceedings,Houston, TX.

Muller H, de Samblanckx S and Matthys D, 1987. “The expert system, approach and the flexibility-complexity problem in scheduling production systems” International Journal of Production Research25 (11).

Nemhauser GL, 1966. Introduction to Dynamic ProgrammingWiley.

Odubiyi JB and Zoch DR, 1987. “A heuristic approach to incremental and reactive scheduling” Telematics and Informatics6 (3/4).

Reddy SD, 1989. “A Study of Optimization Techniques for Activity Scheduling” NASA Goddard, Code 522.2, Greenbelt, MD, 10.

Saaty TL and Kearns KP, 1985. Analytical Planning: The Organization of SystemsPergamon.

Stacy KL and Jaap JP, 1988. “Space station payload operations scheduling with ESP2” In: NASA Johnson, SOAR Conference ProceedingsHouston, TX.

Straguzzi N, 1990. “Space communications scheduler: a rule-based approach to adaptive deadline scheduling” In: NASA Goddard, Conference on Space Applications of Artificial IntelligenceGreenbelt, MD.

Thalman NE and Sparn TP, 1990. “SURE: a science planning and scheduling assistant for a resource based environment” In: NASA Goddard, Conference on Space Applications of Artificial Intelligence ProceedingsGreenbelt, MD.

Zweben M, 1988. “A survey of planning and scheduling research at NASA Ames Research Center” In: NASA Johnson, SOAR Conference Proceedings,Houston, TX.