|
Brindle AF and Anderson BH, 1986. “A Space Station Onboard Scheduling Assistant” Boeing Aerospace Company, Technical Report. |
|
Britt DL, Geoffroy AL and Gohring JR, 1988. “Contingency rescheduling of spacecraft operations” Telematics and Informatics5 (3). |
|
Brown MC, 1988. “The dynamic rescheduler: conquering the changing production environment” In: IEEE AI Applications ConferenceIEEE Computer Society,Washington, DC. |
|
Collins C, George J and Zamani E, 1989. “Strategies for Automatic Planning: A Collection of Ideas” NASA Jet Propulsion Laboratory, JPL Publication89–12, Pasadena, CA, 05 1. |
|
Computer Sciences Corporation, 1990. Network Control Center User Planning System System Requirements DocumentNASA Goddard, Greenbelt, MD, 02. |
|
Computer Sciences Corporation, 1988. User Planning System Operational Concept DocumentNASA Goddard Space Flight Center, Greenbelt, MD, 09. |
|
CTA Incorporated, 1990. Lessons Learned from the Network Control Center (Draft)NASA Goddard, Greenbelt, MD. |
|
Das BK, Berg RA and Janssen T, 1988. “NOA: A Network Operator Assistant for Scheduling TDRSS” In: NASA Marshall Second Conference on Artificial Intelligence for Space ApplicationsHuntsville, AL. |
|
Decision Support Software, Inc., 1985. Expert Choice Manual 1430 Vincent Place, McLean, Virginia. |
|
Durham R, Reilly NB and Springer JB, 1990. “Resource Allocation Planning Helper (RALPH): lessons learned” In: NASA Goddard, Conference on Space Applications of Artificial Intelligence ProceedingsGreenbelt, MD. |
|
Eggemeyer WC and Cruz JW, 1990. “Plan-It-2; the next generation planning and scheduling tool” In: NASA Goddard, Conference on Space Applications of Artificial Intelligence ProceedingsGreenbelt, MD. |
|
Floyd S and Ford D, 1986. “An expert system for dynamic scheduling” In: 21st Intersociety Energy Conversion Engineering Conference ProceedingsAmerican Chemical Society. |
|
Fox MS, Allen B and Strohm G, 1982. “Job shop scheduling: an investigation in constraint-directed reasoning”: National Conference on AI ProceedingsAmerican Association for Artificial Intelligence,Menlo Park, CA. |
|
Geoffroy AL, Britt DL and Gohring JR, 1990. “The Role of Artificial Intelligence Techniques in Scheduling Systems” In: Proceedings Goddard Conference on Space Applications of Artificial IntelligenceNASA,Goddard. |
|
Goodman N, 1989. “Scheduling Results Analysis Report for the NCC Prototype Testing” Task 20–103, NASA Goddard, Greenbelt, MD, 11. |
|
Hankins GB, Jordan JW, Katz JL, Mulvehill AM, Dumoulin JN and Ragusa J, 1985. “Expert mission planning and replanning scheduling system” In: Expert Systems in Government Conference ProceedingsIEEE Computer Society,Washington, DC. |
|
Hedberg S, 1989. “AI in scheduling” Spang Robinson Report on Artificial Intelligence5 (3) 03. |
|
Jaap JP and Davis EK, 1988. “The scheduling techniques of ESP2” In: NASA Johnson, SOAR Conference ProceedingsHouston, TX. |
|
Liebowitz J and Lightfoot P, 1987. “Expert scheduling systems: survey and preliminary design concepts” Applied Artificial Intelligence Journal1 (3). |
|
Liebowitz J, 1989. “Problem selection methodologies for expert systems development” In: Liebowitz J and DeSalvo DA (eds.), Structuring Expert Systems: Domain, Design, and Development, Prentice Hall. |
|
Matlin S, 1988. “Automatic scheduling and planning (ASAP) in future ground control systems” In: Artificial Intelligence for Space Applications Conference ProceedingsNASA,Marshall. |
|
McLean DR and Dent CP, 1989. “Reactive planning techniques for satellite mission planning” In: Expersys-89 ProceedingsIITT-International, Paris. |
|
McLean DR, Page BJ and Potter WJ, 1990. “The Explorer platform planning system: an application of a resource reasoning planning shell” In: Proceedings Ground-Based Spacecraft Control ConferenceDarmstadt, Germany. |
|
McLean DR, 1990. The Explorer Platform Planning System Phase 1 Critical Design Review DocumentBendix Field Engineering, Inc., Seabrook, MD, 06 18. |
|
Miller G, Johnston M, Vick S, Sponsler J and Lindenmayer K, 1988. “Knowledge based tools for Hubble Space Telescope planning and scheduling: constraints and strategies” Telematics and Informatics5 (3). |
|
Mitchell P, 1989. “An expert system for shuttle and satellite radar tracker scheduling” In: NASA Johnson, SOAR Conference Proceedings,Houston, TX. |
|
Muller H, de Samblanckx S and Matthys D, 1987. “The expert system, approach and the flexibility-complexity problem in scheduling production systems” International Journal of Production Research25 (11). |
|
Nemhauser GL, 1966. Introduction to Dynamic ProgrammingWiley. |
|
Odubiyi JB and Zoch DR, 1987. “A heuristic approach to incremental and reactive scheduling” Telematics and Informatics6 (3/4). |
|
Reddy SD, 1989. “A Study of Optimization Techniques for Activity Scheduling” NASA Goddard, Code 522.2, Greenbelt, MD, 10. |
|
Saaty TL and Kearns KP, 1985. Analytical Planning: The Organization of SystemsPergamon. |
|
Stacy KL and Jaap JP, 1988. “Space station payload operations scheduling with ESP2” In: NASA Johnson, SOAR Conference ProceedingsHouston, TX. |
|
Straguzzi N, 1990. “Space communications scheduler: a rule-based approach to adaptive deadline scheduling” In: NASA Goddard, Conference on Space Applications of Artificial IntelligenceGreenbelt, MD. |
|
Thalman NE and Sparn TP, 1990. “SURE: a science planning and scheduling assistant for a resource based environment” In: NASA Goddard, Conference on Space Applications of Artificial Intelligence ProceedingsGreenbelt, MD. |
|
Zweben M, 1988. “A survey of planning and scheduling research at NASA Ames Research Center” In: NASA Johnson, SOAR Conference Proceedings,Houston, TX. |